Vinton Construction

STH 96 and Fox River Bridge, Village of Wrightstown

Wisconsin Department of Transportation / Wrightstown, WI

http://fzt.aprender-a-bailar.com/images/2017%20STH%2096%20Wrightstown%20Bridge/_projectHero/03012015-to-10282015-087.JPG

Date Completed:

July 2016

Services:

Concrete Pavement, Earthwork & Grading

Design Engineer:

Mead and Hunt Inc.

Construction Engineer:

Omnni Associates

Project Summary:

Vinton Construction was a subcontractor on this $18 million dollar construction project consisting of the new Fox River Bridge, two concrete roundabouts, concrete pavement, grading and storm sewer. Vinton’s work included the grading and concrete pavement on this project.

Contract Amount:

$18,707,562.00

Project Length:

1 Mile

By the Numbers:

  • 20,300 SY of 8”-10”-inch Concrete Pavement
  • 9576 SY of Removing Concrete Pavement
  • 24,956 CY of Common Excavation
  • 18005 CY of Borrow
  • 19,138 Tons of 1.25” Base Aggregate
  • 18,000 Tons of Breaker Run